Control cabinet wiring comes much later in the project schedule, yet it is regularly the first task to face time pressure. Previous phases lose days, the commissioning window remains fixed, and the time buffer is cut from the wiring phase. The problem with this is that errors do not become apparent immediately, but only during functional testing. By then, the terminals are already wired, the cables are in place, and the system is partially closed. At this stage, every correction takes many times longer than it would have taken to do the job carefully from the start.
Before a proposal can be considered reliable, its scope must be clearly defined. It is generally divided into three levels.
This is where the connections between the installed components are made: power wiring from the power supply through fuses and contactors to the output terminals, and control wiring between the controller, relays, and terminal blocks. In addition, there is the routing of wires through conduits, ensuring that power and signal lines are kept separate, and the neat connection of wires to the terminals. The amount of work involved depends less on the size of the cabinet than on the number of terminal connections.
The cabinet is not an end in itself; it controls a system. That is why fieldwork is part of the scope: pulling cables, routing them along cable runs and through conduits, and connecting motors, sensors, valves, and control stations. These tasks are carried out in various locations throughout the facility and often overlap with mechanical assembly, which requires coordinated scheduling. If the field connection coincides with the installation of the system, it is usually contracted as part of the machinery and equipment assembly.
This is the part that most often leads to discussions during handover. Wires and terminals are labeled according to the diagram, cables are marked, and any deviations from the wiring diagram are recorded. A system that is operational but not properly documented will incur additional costs every time a fault is investigated or modifications are made. That is why maintaining the schematics is part of the scope of work and not a matter of goodwill.
The first step is to review the circuit diagram, terminal diagram, and bill of materials. We verify whether the documents are up-to-date and complete, and whether the delivered components match the diagram. It is significantly less expensive to resolve any discrepancies at this stage than in the middle of production. At the same time, wiring materials, labeling, and tools are prepared.
Installation typically begins with the power wiring, followed by the control wiring. Work is carried out strictly according to plan, with labeling done as work progresses rather than retroactively. Whenever possible, the cabinet is wired in advance in the workshop and only then installed on site, which significantly reduces the time spent in the facility.
Once the wiring is complete, a visual inspection, continuity and insulation tests, and a comparison with the schematics are performed. Only then is power applied, and the control functions are tested one by one. It is important that these tests be conducted throughout the project and not be postponed until the very end.
During commissioning, the wiring is tested in conjunction with the system, error messages are investigated, and parameters are adjusted. The handover includes updated documentation. All electrical aspects of these tasks fall under the scope of electrical engineering and automation.
If testing is done exclusively at the end, all results come in at once—and usually during the project’s tightest time window. It makes more sense to conduct interim inspections after completing individual sections, such as after the power wiring is finished and after each terminal block is installed. The comparison with the plan is not done from memory, but rather using the cable list that is kept on hand during the installation process.
The quality of a wiring installation isn’t evident on the day of handover, but rather when the first malfunction occurs two years later. It is therefore crucial that a third party be able to understand the system based on the documentation. This includes ensuring that the system conforms to the plans, documenting any deviations, and providing labeling that matches the documentation. The inspections are conducted in accordance with standards and are documented.
In practice, contracts are awarded in three ways. First, as a distinct, standalone project, where the cabinet is delivered and only the wiring remains to be completed. Second, as part of a system installation in which mechanical and electrical engineering are planned together. Third, as reinforcement for an existing electrical team during peak workloads or parallel projects, carried out by installation personnel under a contract for work and services. The difference from temporary staffing is that a defined work outcome is required, rather than simply working hours.
Control cabinet construction includes the enclosure, mounting plate, and the mechanical installation of components. Wiring then establishes the electrical connections—inside the cabinet according to the circuit diagram and to the system according to the terminal diagram. These two aspects are often contracted separately.
That depends on the number of connection points, not on the size of the control cabinet. A relatively simple control cabinet with up-to-date drawings can be completed in a few days, while complex cabinets with extensive field connections take several weeks. The single most important factor is the quality of the documentation.
It is possible, but it is rarely advisable. First, the existing system should be assessed and the plan updated. If work is based on outdated documentation, it will result in rework that usually doesn’t become apparent until the system is put into operation—at which point it becomes particularly costly.
Whenever the project specifications allow, the cabinet is wired and tested in advance at the workshop and only then delivered to the site. This significantly reduces the time spent in the facility. Field wiring and connection to the system must be performed on site.
The inspection is part of the scope of work performed by the qualified electricians: visual inspection, continuity and insulation testing, and verification against the plan. The results are recorded and provided along with the documentation.
This should be explicitly specified in the proposal. Wiring inside the cabinet and system cabling are different scopes of work that involve very different levels of effort. Unclear distinctions in this regard are one of the most common causes of change orders.
At A&P Industriemontage, we support companies worldwide in the installation and commissioning of complex industrial plants. With our expertise and comprehensive range of services, we ensure efficient and safe production processes. Trust in our many years of experience, and let’s work together to successfully implement your projects.