Machine Retrofits

When Modernization Is Worth It

When retrofitting machines, the focus is rarely on the mechanics. The trigger is usually something else: The control system has been discontinued, replacement parts are only available on the used market, and the system cannot be integrated into the overarching production planning. The base machine itself often still runs perfectly well. It is precisely in this situation that the decision is made as to whether modernization is the right approach or whether purchasing a new machine makes more sense. The following criteria and the typical project workflow help in making this assessment.

What Specifically Is Replaced During the Retrofit of Machines and Equipment

A retrofit is not simply an extended repair. It involves not only replacing defective parts, but also bringing entire functional levels up to a new technical standard. In practice, this applies to three areas that can be considered independently of one another.

Controls, Electrical Systems, and Wiring

The most common scope of work involves replacing the control system. A discontinued PLC is replaced with a current-generation model, the control cabinet is rebuilt or retrofitted, and the field wiring is adjusted. In addition, there are sensors and actuators, many of which are no longer available. The effort involved here lies less in the installation itself than in the documentation: if up-to-date circuit diagrams are missing, the existing system must first be surveyed. This work falls under the scope of electrical engineering and automation and usually determines the timeline of the entire project.

Mechanical Assemblies and Alignment

On the mechanical side, the focus is on wear parts that directly affect production quality: guides, bearings, drives, and spindles. After replacement, realignment is necessary so that the machine can return to its original tolerances. If this step is scheduled too tightly, the consequences will only become apparent during operation in the form of dimensional deviations and increased wear.

Safety Technology and Operating Concept

Older machines often no longer meet today’s requirements for safety devices. Separating safety devices, light curtains, a revised emergency stop concept, and the associated safety-related control system are therefore regularly included in the scope of work. At the same time, the operator interface is often updated, as a modern HMI reduces setup times and makes the system easier for new employees to master.

Five Reasons to Consider a Retrofit

Whether the modernization is technically feasible can generally be determined by considering five factors:
  1. The controller has been discontinued. Spare parts are now only available on the secondhand market or from remaining stock, which leads to unpredictable downtime in the event of a breakdown.
  2. The basic mechanical structure is sound. The machine bed, frame, and major assemblies show no signs of critical wear and provide a sturdy foundation for many more years of operation.
  3. The machine performs a special function. For custom-built systems and special-purpose machines, there is no off-the-shelf product that can serve as a direct replacement; developing a new solution would be the more time-consuming option.
  4. There is no integration with higher-level systems. If operational data, feedback to production planning, or an interface to the control system is required, this can be implemented via the new control level.
  5. The downtime window can be scheduled. Company holidays, a weekend, or a previously scheduled maintenance period provide a defined framework for the project.

When Buying New Is the Better Choice

Not every piece of equipment should be modernized. If the base machine shows signs of severe wear on its load-bearing structures, the retrofit becomes a bottomless pit because new tasks keep being added as the project progresses.
The same applies when product requirements have changed. If the system is expected to maintain tighter tolerances, achieve shorter cycle times, or process different materials in the future, modernization will reach its design limits. A new control system does not make a machine faster.
A lack of documentation or unusable documentation can also work against the project. If the entire electrical system must be reconstructed, the focus shifts from implementation to assessment. And if the required safety level can only be achieved through extensive structural modifications, the project crosses the line into new construction.

Here's the procedure for a Retrofit Project

In most projects, the procedure consists of four phases.

Assessment and Scope Definition

The first step is an on-site inspection. We assess the mechanical and electrical systems as well as the existing documentation, and document any outstanding issues. Based on this, we determine the scope of the project and coordinate the downtime window with production and maintenance. This phase is critical to ensuring that the entire project stays on schedule.

Preparation and Prefabrication

Control components, control cabinet assemblies, and mechanical subassemblies are procured and manufactured in advance as much as possible. A control cabinet that has been prefabricated and tested off-site significantly reduces the time required on-site. At the same time, assembly planning and the sequence of operations are developed.

Disassembly, Assembly, and Electrical Installation

At the start of the shutdown, the affected components are dismantled. This is followed by mechanical assembly, alignment, and electrical installation, including wiring and connection to the control panel. Because mechanical and electrical work are interdependent here, the trades ideally work as part of the same team. An example of the electrical work involved in a project of this scope is the control cabinet wiring for two mixing systems.

Commissioning and Handover

After installation, a functional test, trial run, and fine-tuning of the control system are performed. The system is handed over to production along with updated documentation, often accompanied by training for the operating personnel. The procedure and requirements largely correspond to those of a traditional machine and plant installation, with the difference that existing and new parts must be integrated.

Implementing a Retrofit During Normal Operations

In practice, the plant rarely comes to a standstill during the renovation. The neighboring facilities continue to operate, and the project must be integrated into ongoing operations.

Plan Downtime Windows Realistically

A schedule that’s too tight is the most common cause of delays. Realistic planning means factoring in buffer time for issues that only become apparent after dismantling, and scheduling interim inspections rather than postponing all tests until the end of the project. The article on dismantling during ongoing operations also illustrates how work can be structured under these conditions.

Coordination with Maintenance and Production

Access routes, crane paths, work permits, and safety requirements must be coordinated with the on-site personnel before the team arrives. Having a designated point of contact on both sides prevents decisions from having to go through multiple levels of management, thereby avoiding delays.

Retrofit with A & P Industriemontage

A & P Industriemontage carries out retrofit projects using its own skilled workers in the fields of mechanical and electrical engineering. The team consists of installers, metalworkers, welders, structural metal fabricators, electronics technicians, and mechatronics engineers who work together on the same project in an interdisciplinary manner. Projects are carried out under a contract for work and services, which can include the provision of tools and machinery upon request, and can also be structured as support for a client’s own maintenance teams through the provision of installation personnel under the same contract. Since 2004, A & P has been carrying out projects in Germany, Europe, and worldwide, certified to DIN EN ISO 9001.
Are you planning to modernize a machine or system? Inquire about a project quote and discuss the details with a dedicated contact person.

Frequently Asked Questions About Machine Retrofits (FAQ)

During a repair, a defective part is replaced and the system is restored to its original condition. During a retrofit, entire functional levels are brought up to current technical standards—typically the control system, electrical system, and safety technology. Afterward, the system is capable of more than before; for example, it can provide data to production planning.

That depends on the scope of the project and the available downtime window. A simple control system replacement using a prefabricated control cabinet can be completed in a few days, while comprehensive projects involving mechanical work and new safety technology take several weeks. The key factor is how much can be manufactured and tested in advance.

Generally speaking, yes. A prerequisite is a reliable mapping of the existing functions, because the control logic must be reimplemented. If up-to-date documentation is missing, this step becomes the main driver of the project’s costs.

In most cases, yes. The affected system is shut down, while surrounding production continues. This requires coordinated access points, crane routes, and system enablements, as well as a realistically planned time window with a buffer for issues that may only become apparent after disassembly.

This must be assessed on a case-by-case basis. If the modernization affects safety functions or the machine’s performance, a reassessment may be necessary. This determination should be made during the planning phase and clarified in consultation with the operator and the relevant technical authority.

Ideally, the same team. In a retrofit, mechanical and electrical engineering are closely intertwined—for example, when sensors need to be recalibrated after alignment. Having two separate contractors working on this interface leads to coordination efforts and delays.

Otto Peklo, Managing Director

At A&P Industriemontage, we support companies worldwide in the installation and commissioning of complex industrial plants. With our expertise and comprehensive range of services, we ensure efficient and safe production processes. Trust in our many years of experience, and let’s work together to successfully implement your projects.

Share this post:
Facebook
Twitter
LinkedIn

Request a quote

See for yourself how much experience we have, and get expert advice on your project—with no obligation.